The Korean War Veterans Memorial Wall of Remembrance

On July 27, 2022, the Korean War Veterans Memorial on the National Mall will have a new focal point — a remembrance wall featuring the names of more than 36,000 Americans who died supporting the War and over 7,100 Koreans who died while augmenting the Army. Their names will be organized by rank and respective branch of service, demonstrating how the War’s burden fell unevenly across the military.

BREAKDOWN OF NAMES

United States Army
United States Marine Corps
United States Navy
United States Air Force

29,857
4,522
668
1,587

TOTAL US CASUALTIES
TOTAL ROK CASUALTIES

36,634
7,174

COMBINED CAUSALITY COUNT

43,808

In March of 2021, the Korean War Veterans Memorial Foundation and The National Park Service started construction on the Wall of Remembrance and overall rehabilitation of the Korean War Veterans Memorial.

The sloped, granite Wall of Remembrance will encircle the existing Pool of Remembrance, complementing the original design of the Memorial. The circular plaza around the Pool of Remembrance will be extended to accommodate the wall. Two new pedestrian paths will provide access to the Memorial from Ash Road and Independence Avenue.

During the construction of the Wall of Remembrance, the Korean War Veterans Memorial Foundation will also rehabilitate the 25-year-old Memorial. Crews will:

  • Repair pavement
  • Replace the engraved names of participating countries and casualty figures with stainless steel letters
  • Refinish the stainless-steel statues
  • Replace the linden trees around the Pool of Remembrance
  • Replace the juniper trees in the Field of Service
  • Update the existing lighting with high-efficiency LED lamps

Planning Phases

Korean War Veterans Memorial Wall of Remembrance Act

On October 7, 2016, Congress enacted the “Korean War Veterans Memorial Wall of Remembrance Act’’ (Public Law 114–230). This legislation authorized the KWVMF to construct a Wall of Remembrance at the Korean War Veterans Memorial. The Act required that the wall include a list of names of members of the Armed Forces of the United States who died in the Korean War, as determined by the Secretary of Defense. The Wall of Remembrance will also include other information about the Korean War, including the number of members of the Armed Forces of the United States, the Korean Augmentation to the United States Army, the Republic of Korea Armed Forces, and the other nations of the United Nations Command who, in regards to the Korean War— (A) were killed in action; (B) were wounded in action; (C) are listed as missing in action; or (D) were prisoners of War.

Wall of Remembrance Act’’ (Public Law 114–230)

U.S. Rep. Sam Johnson, left, receives congratulations from Speaker of the House Paul Ryan for his work on a bill to add a Wall of Remembrance to the Korean War Memorial.

Design Approval

In order to reduce impacts to the Memorial and the National Mall, the preferred design concept has a minimal approach. The design consisted of adding a low angled wall integrated into the landscape surrounding the original Memorial; expanding the circular plaza outside the two rows of linden trees by nine feet to provide circulation around the new curvilinear wall; raising the existing berm from the surrounding landscape from four to ten percent to conceal most of the wall and maintain reciprocal views of the Memorial and the National Mall; providing two new pedestrian paths to connect the Pool of Remembrance to Ash Road and Independence Avenue, and rehabilitating the existing Memorial.

KWVMF Design Report

This slideshow requires JavaScript.

Fundraising

Through the generous donations of the American and Korean people, the necessary funding of $22 million for the construction costs of the Wall of Remembrance has been raised.

This slideshow requires JavaScript.

Groundbreaking Ceremony

On Friday, May 21, 2021, the Korean War Veterans Memorial Foundation (KWVMF) hosted the Korean War Veterans Memorial Wall of Remembrance Groundbreaking Ceremony & Broadcast. The groundbreaking marked the completion of years-long fundraising to for the construction.

The opening segment of the virtual broadcast included live and pre-taped interviews with Korean War Veterans, dignitary welcome messages, and a history of the Memorial and the Wall of Remembrance.

Speakers and Dignitaries In Attendance:

  • General John H Tilelli, Jr., U.S. Retired, Chairman of the Korean War Veterans Memorial Foundation, (Host)
  • President Moon Jae-in, Republic of Korea
  • The Honorable Lee Soo-Hyuc, Republic of Korea Ambassador to the United States of America
  • Governor Larry Hogan & First Lady Yumi Hogan, State of Maryland
  • The Honorable Lloyd J. Austin III, Secretary of Defense, United States of America
  • The Honorable Hwang Ki-chul, Minister to Ministry of Patriot and Veterans Affairs, Republic of Korea
  • Mr. Kelly K. Mckeague, Director, Department of Defense POW/MIA’s Accountability Agency, United States of America
  • Ms. Shannon Estenoz, Principal Deputy Assistant Secretary of Fish, Wildlife and National Parks, U.S. Department of the Interior

Watch – Wall of Remembrance Groundbreaking Broadcast

This slideshow requires JavaScript.

Construction Time-Lapse Video

April 24, 2021 – June 1, 2022
United States Army Band, Pershing’s Own. “Armed Forces Medley”

Completion of the Wall of Remembrance and restoration of the Memorial is scheduled to be completed by early summer 2022.

Wall of Remembrance Dedication Ceremony

On July 27, 2022, the Wall of Remembrance will become the permanent home to the names of over 36,000 American servicemen and 7,100 Korean Augmentation to the United States Army (KATUSA) who gave their lives defending the people of South Korea.

Please save the date. Formal invitations will be sent out in early June.

Interested in Attending? Click here for more information.

Wall of Remembrance Build & Memorial Restoration Progress

Our Whiting Turner contractors were on site this week to view and test the recently installed lights at the Wall of Remembrance – rail lights along the WOR segment #1,…

PoR PLAZA: Sand set paver reinstallation continued for segments 1 & 3 in March. WoR panels 001 & 002 were completed on 3/2. Caulking for the WoR panels in segments…

Wall of Remembrance – First Panel Unveiling On March 8, 2022 General John Tilelli, Chairman and President of the Korean War Veterans Memorial Foundation and Ambassador Lee, Soo-hyuck, Republic of…

PoR PLAZA: Sand set paver reinstallation in segments 3 & 2 are ongoing and will continue into March. Segment 1 sand set pavers install picked up on 2/16. The installation…

PoR PLAZA: Sand set paver reinstallation in segments 3 & 2 are ongoing and will continue into February. Segment 1 sand set pavers will begin in February. The installation of…

PoR PLAZA: Sand set paver reinstallation in segments 3 & 2 are ongoing and will continue into January. The last section of the plaza gutter in segment 1 was installed…

November 2021 Onsite Progress PoR PLAZA: Mortar set paver grouting (7’ radius from edge of pool) was completed 11/5. Sand set paver reinstallation (7’ to 32’) began on 11/10 in…

October 2021 Onsite Progress PoR PLAZA: WoR concrete slab: rebar and vapor barrier completed in early October form work is on going and all walls are scheduled to be completed…

PoR PLAZA: Segment 3 horizontal slab pour was completed on 9/7. WoR concrete slab base rebar was started in all segments on 9/14, the pours are scheduled for late October….

PoR PLAZA: The leaf collector piping coming out of the pool was completed on 7/19. Drip line irrigation sleeves began install in segment 1 of the plaza on 7/19. Underground…

PoR PLAZA: The sub-drainage piping and aggregate base installation which began on 5/24 was completed on 6/15. The planting soil in the plaza started on 6/15 and is scheduled to…

PoR PLAZA: Soil removal beneath the demolished slab and cutting and capping of existing utilities, which started in April, both completed on 5/7. Helical pile installation began on 5/10 and…

CONSTRUCTION BARRICADE: Construction barricades and fencing installation completed this month. Mesh fence with scrim barricade was completed on 4/7. The entrance gate was installed and completed on 4/8. Wooden barricades…

CONSTRUCTION BARRICADE: Wooden barricade will be completed by end of week 4/5. Mesh fence with scrim barricade installed with the exception of the construction entrance gate. This entrance gate is…